• Thirty years of electrical engineering experience in Alaska's medium and large oilfield projects. Specializing in petroleum, industrial, commercial and public utility. We provide supervision, engineering management, power distribution, power generation, generation control, transmission controls, fire and gas systems, instrumentation, lighting, and communications. We also specialize in the analysis of Load Flow, Short Circuit, Arc-Flash, etc.


    PROFESSIONAL REGISTRATION
    Alaska EE-5269
    Alaska Fire System Design Permit IC-DO #08-076

Experience

Numerous water and wastewater projects in remote villages in Alaska while working as the electrical department lead for the Alaska Native Tribal Health Consortium. Projects included electrical distribution, emergency power, and control system design and construction supervision of water and waste water facilities in remote villages of Alaska. Work also included design, project administration and oversight of control panels built in ANTHC’s panel shop.

ConocoPhillips – Numerous medium and large scale petroleum projects. Responsibilities included assignment as an Electrical Technical Authority working directly engineering contractors on ConocoPhillips projects.

ASRC Energy Services – Onshore and offshore development of Schrader Bluff on Alaska’s North Slope Electrical design included 13.8 kV primary and 480V secondary distribution. Power generation and Control. 13.8kV and 25 kV Transformer Protection. Systems analysis using ETAP modeling Software. Analysis included Load Flow, Short Circuit, Arc-Flash, Harmonics, and Transient Stability Analysis. In addition, breaker settings report and Arc-Flash signage was provided.

ARCO - Drill Site “1H” Design. Provided electrical system project management and design for a drill site location at the Kuparuk Field, North Slope Alaska. Design included Production, electrical, chemical injection, methanol, test separator and production heater modules. Electrical design included 13.8 kV primary with 480V secondary distribution. Instrumentation design included a PLC based monitoring, fire and gas alarm systems and control with interface to a central data gathering and control system.

Numerous other petroleum related projects with experience and duties similar to the above referenced project (ARCO - Drill Site “1H” Design):

* Surface Facilities Optimization Project – Prudhoe Bay, Alaska
* W – Pad Water Injection Pilot Project – Prudhoe Bay, Alaska
* Z – Pad Open Air Production Skid – Prudhoe Bay, Alaska
* Drill Site 18 Expansion, Phase II – Prudhoe Bay, Alaska
* Small Scale Enhanced Oil Recovery Project. Kuparuk, Alaska
* Drill Site “1Y” Kuparuk, Alaska
* Dolly Varden Platform Fire & Gas System Upgrade. Kenai Alaska
* Ballast Water Treatment Facility. Valdez. Alaska

Alyeska Pipeline Service Company - Ballast Water Treatment Facility. Design included two eleven (11) million gallon concrete tanks for ballast water treatment. Electrical design included 13.8 kV and 480V power distribution, and motor control. Instrumentation design included PLC based monitoring, control and alarm with replacement of the existing PLC with a new PLC and software.